Answer:
It is recommended that construction companies apply waterproofing separately for the inter-layer joints and the shear crack on the exterior walls before painting the exterior surface. This is because the cost of waterproofing beforehand is definitely much lower than the cost of repairing the leakage afterwards. The detailed waterproofing construction regulations are as follows:
