(One hundred questions about waterproofing) Question #68: Some people say that the expense of cladding the exterior walls is too much to bear; construction from the outside is also very extensive; why not just install tiles indoors to completely solve the problem? Is this a correct view? If it is not possible to do the cladding from the outside, can it be done from the inside?

Answer: (i) Of course, that is incorrect! This kind of haphazard construction that overlooks the big picture and fails to address the root cause is ultimately a waste of resources and a waste of labor. In the short term, it may have good results, but in the long run it will be a waste of time and money.

(One Hundred Questions on Waterproofing) Old-style apartments located on the #67th floor or below often have spider-web-like cracks in the exterior walls, causing indoor water seepage and wall cancer. How should waterproofing be repaired? After waterproofing is completed, the wall cancer problem still persists after the interior is repainted. How can it be resolved?

Answer: (i) The exterior structures of the old apartments below the fifth floor are mostly made of reinforced brick construction, and the surfaces are mostly waterproofed with seven-inch stone powder or cement paint; if the mortar quality is not good, the surface will be easily damaged by rain and wind.

(One Hundred Questions on Waterproofing) #65 is limited by the building coverage ratio and the width of the alley; the exterior wall must be retracted into a sloped structure. If the exterior wall structure is completely remodeled, why is it particularly easy to leak water? How can it be prevented?

A: As shown in Figures A and B, after the renovation, due to the poor bond between the old and new concrete, it is particularly prone to joint leakage, which is an unavoidable defect and must be prevented beforehand. […]

(One Hundred Questions on Waterproofing) How can we prevent leakage of water from indirect seams and shear stress cracks in exterior walls during construction of #64new projects? What are the construction standards for this?

A: It is recommended that construction companies order waterproofing separately for the external wall joints and the shear cracks on the window edges before painting the exterior walls. The cost of waterproofing beforehand is definitely much lower than the cost of painting the exterior walls.

(One Hundred Questions on Waterproofing) In the open space courtyard in the #58th floor, water leakage has occurred due to cracking in the floor slab. If we need to repair and renovate the water leakage on the courtyard, it would be too much trouble. Is it possible to repair the water leakage directly from the ceiling in the ground floor? What are the various methods of repair?

A: The courtyard is leaking due to cracks; the construction was carried out directly from the basement ceiling; if the construction method is correct and the techniques are proficient, the probability of stopping the leakage can reach over 70%. Generally speaking, it basically consists of […]

(One hundred questions about waterproofing) #54 Why is the water-resistant elastic waterproof adhesive applied to the interior of the building? To achieve a thickness of 3mm or more, must it be applied in more than 5 coats; is it possible to apply a thickness of 2mm at once?

A: In general, water-based waterproof adhesives have a higher elongation rate after curing than PU or waterproof felt. The problem is that these water-soluble elastic materials such as vulcanized rubber or acrylic rubber are brittle and easily deformed.

(One Hundred Questions on Waterproofing of #53New Construction Sites): The waterproofing of the courtyard of the new construction site was originally intended to be a petroleum-based waterproof material, but during the construction process, continuous thunderstorms caused the concrete base to remain wet, affecting the progress of subsequent construction and the issuance of the use permit; is it possible to replace it with water-based, elasticized, and cured waterproof adhesive or elasticized cement?

Answer: Not recommended. (1) Generally speaking, the majority of water leakage in the courtyard occurs due to cracks in the floor, construction seams at corners and intersections, corners, and between ventilation ducts, as well as around the manhole and water outlet.

(One Hundred Questions on Waterproofing) #41: When performing waterproofing work on roofs, what are the key points to pay attention to for areas such as centralized water meter locations, water supply and drainage pipes, fire-fighting water pipes, cooling tower side areas, or base structures?

Answer: (1) Construction procedures – Waterproofing should be carried out before the plumbing installation and before all base plates and pipe support structures are cast in place; the procedure cannot be reversed. ( […]